{"id":8992,"date":"2019-05-02T15:39:00","date_gmt":"2019-05-02T15:39:00","guid":{"rendered":"https:\/\/fernandezjove.com\/?p=8992"},"modified":"2026-04-08T10:26:01","modified_gmt":"2026-04-08T08:26:01","slug":"works-department-hydraulic-installation-aaor-i-y-ii","status":"publish","type":"post","link":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/","title":{"rendered":"Works Department: Hydraulic Installation AAOR I y II"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"h-our-works-department-was-selected-for-the-hydraulic-installation-of-the-aaor-i-and-ii-for-the-australian-navy-at-navantia-ferrol-shipyard\"><em><strong>Our Works Department was selected for the hydraulic installation of the AAOR I and II for the Australian Navy at Navantia Ferrol Shipyard.<\/strong><\/em><\/h2>\n\n\n\n<p>Our works department was selected in the month of September 2018 to carry out the hydraulic installation of the two AAOR for the Australian Navy.<br><br>Since last October, our construction team has been carrying out the hydraulic installation of the AAOR I vessel and has recently begun the installation of the AAOR II. These navy vessels will operate for the Australian Navy as an auxiliary ship capable of transporting fuel, water, spare parts, food, ammunition and medicines so that the fleet it accompanies can remain at sea for 20 days or more without refueling and without berthing no port.<br><br>More than fifty people from our division are installing the hydraulic remote control, as well as the rest of the hydraulic services, such as the installation of quick-closing valves, hinged doors, sliding doors, hydraulic CPP, propellers propulsion, hydraulic lifts, winches bow and windlass, stern winch, ras-fas, pressure differential detection, sprinklers, servotimon, instrumentation. In addition, the corresponding pressure and flushing tests.<br><br><strong>We appreciate the confidence once again from Navantia, to do this work.<\/strong><\/p>\n\n\n\n<p><strong><a href=\"https:\/\/fernandezjove.com\/es\" target=\"_blank\" rel=\"noreferrer noopener\">FERNANDEZ JOVE INTEGRAL SUPPLY<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our Works Department was selected for the hydraulic installation of the AAOR I and II for the Australian Navy at Navantia Ferrol Shipyard.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[254,256,248,158,164],"tags":[234],"class_list":["post-8992","post","type-post","status-publish","format-standard","hentry","category-fj","category-hydraulic-equipment","category-news","category-products-and-services","category-projects","tag-fj-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Works Department: Hydraulic Installation AAOR I y II - FJ | Flow Control Solutions<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Works Department: Hydraulic Installation AAOR I y II\" \/>\n<meta property=\"og:description\" content=\"Our Works Department was selected for the hydraulic installation of the AAOR I and II for the Australian Navy at Navantia Ferrol Shipyard.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\" \/>\n<meta property=\"og:site_name\" content=\"FJ | Flow Control Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2019-05-02T15:39:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-08T08:26:01+00:00\" \/>\n<meta name=\"author\" content=\"Ana Amor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ana Amor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\"},\"author\":{\"name\":\"Ana Amor\",\"@id\":\"https:\/\/fjove.com\/#\/schema\/person\/9ff3ff15c1fb7644faae8d074a1153a9\"},\"headline\":\"Works Department: Hydraulic Installation AAOR I y II\",\"datePublished\":\"2019-05-02T15:39:00+00:00\",\"dateModified\":\"2026-04-08T08:26:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\"},\"wordCount\":204,\"publisher\":{\"@id\":\"https:\/\/fjove.com\/#organization\"},\"keywords\":[\"FJ\/ EN\"],\"articleSection\":[\"FJ\",\"Hydraulic Equipment\",\"News\",\"Products and Services\",\"Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\",\"url\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\",\"name\":\"Works Department: Hydraulic Installation AAOR I y II - FJ | Flow Control Solutions\",\"isPartOf\":{\"@id\":\"https:\/\/fjove.com\/#website\"},\"datePublished\":\"2019-05-02T15:39:00+00:00\",\"dateModified\":\"2026-04-08T08:26:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\/\/fjove.com\/en\/fj-flow-control-solutions\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Works Department: Hydraulic Installation AAOR I y II\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/fjove.com\/#website\",\"url\":\"https:\/\/fjove.com\/\",\"name\":\"FJ | Flow Control Solutions\",\"description\":\"Engineering, remote valve control systems and valve manufacture\",\"publisher\":{\"@id\":\"https:\/\/fjove.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/fjove.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/fjove.com\/#organization\",\"name\":\"FJ | Fern\u00e1ndez Jove\",\"url\":\"https:\/\/fjove.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/fjove.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/fjove.com\/wp-content\/uploads\/2026\/02\/fj-flow-control-solutions.gif\",\"contentUrl\":\"https:\/\/fjove.com\/wp-content\/uploads\/2026\/02\/fj-flow-control-solutions.gif\",\"width\":122,\"height\":48,\"caption\":\"FJ | Fern\u00e1ndez Jove\"},\"image\":{\"@id\":\"https:\/\/fjove.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/es.linkedin.com\/company\/fernndez-jove-comercial-e-ingeniera\"],\"email\":\"fjsales@fjove.com\",\"legalName\":\"Fernandez Jove Comercial e Ingenier\u00eda S.L.\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/fjove.com\/#\/schema\/person\/9ff3ff15c1fb7644faae8d074a1153a9\",\"name\":\"Ana Amor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g\",\"caption\":\"Ana Amor\"},\"sameAs\":[\"https:\/\/fjove.com\"],\"url\":\"https:\/\/fjove.com\/en\/author\/ana\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Works Department: Hydraulic Installation AAOR I y II - FJ | Flow Control Solutions","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/","og_locale":"en_US","og_type":"article","og_title":"Works Department: Hydraulic Installation AAOR I y II","og_description":"Our Works Department was selected for the hydraulic installation of the AAOR I and II for the Australian Navy at Navantia Ferrol Shipyard.","og_url":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/","og_site_name":"FJ | Flow Control Solutions","article_published_time":"2019-05-02T15:39:00+00:00","article_modified_time":"2026-04-08T08:26:01+00:00","author":"Ana Amor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ana Amor","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#article","isPartOf":{"@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/"},"author":{"name":"Ana Amor","@id":"https:\/\/fjove.com\/#\/schema\/person\/9ff3ff15c1fb7644faae8d074a1153a9"},"headline":"Works Department: Hydraulic Installation AAOR I y II","datePublished":"2019-05-02T15:39:00+00:00","dateModified":"2026-04-08T08:26:01+00:00","mainEntityOfPage":{"@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/"},"wordCount":204,"publisher":{"@id":"https:\/\/fjove.com\/#organization"},"keywords":["FJ\/ EN"],"articleSection":["FJ","Hydraulic Equipment","News","Products and Services","Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/","url":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/","name":"Works Department: Hydraulic Installation AAOR I y II - FJ | Flow Control Solutions","isPartOf":{"@id":"https:\/\/fjove.com\/#website"},"datePublished":"2019-05-02T15:39:00+00:00","dateModified":"2026-04-08T08:26:01+00:00","breadcrumb":{"@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/fjove.com\/en\/works-department-hydraulic-installation-aaor-i-y-ii\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/fjove.com\/en\/fj-flow-control-solutions\/"},{"@type":"ListItem","position":2,"name":"Works Department: Hydraulic Installation AAOR I y II"}]},{"@type":"WebSite","@id":"https:\/\/fjove.com\/#website","url":"https:\/\/fjove.com\/","name":"FJ | Flow Control Solutions","description":"Engineering, remote valve control systems and valve manufacture","publisher":{"@id":"https:\/\/fjove.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fjove.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fjove.com\/#organization","name":"FJ | Fern\u00e1ndez Jove","url":"https:\/\/fjove.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fjove.com\/#\/schema\/logo\/image\/","url":"https:\/\/fjove.com\/wp-content\/uploads\/2026\/02\/fj-flow-control-solutions.gif","contentUrl":"https:\/\/fjove.com\/wp-content\/uploads\/2026\/02\/fj-flow-control-solutions.gif","width":122,"height":48,"caption":"FJ | Fern\u00e1ndez Jove"},"image":{"@id":"https:\/\/fjove.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/es.linkedin.com\/company\/fernndez-jove-comercial-e-ingeniera"],"email":"fjsales@fjove.com","legalName":"Fernandez Jove Comercial e Ingenier\u00eda S.L."},{"@type":"Person","@id":"https:\/\/fjove.com\/#\/schema\/person\/9ff3ff15c1fb7644faae8d074a1153a9","name":"Ana Amor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3017abfe01628b193fc667622e716b79d754ec5150fa0cd08d3b6655c09d06cd?s=96&d=mm&r=g","caption":"Ana Amor"},"sameAs":["https:\/\/fjove.com"],"url":"https:\/\/fjove.com\/en\/author\/ana\/"}]}},"_links":{"self":[{"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/posts\/8992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/comments?post=8992"}],"version-history":[{"count":2,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/posts\/8992\/revisions"}],"predecessor-version":[{"id":16925,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/posts\/8992\/revisions\/16925"}],"wp:attachment":[{"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/media?parent=8992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/categories?post=8992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fjove.com\/en\/wp-json\/wp\/v2\/tags?post=8992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}